-
Change Country
- Sign in
- Submit RFQ
Step 1 Add the items into your cart or submit a Purchase order
Step 2 Checkout, select NET30 payment (provide company registration and VAT number)
Step 3 Delivery via TNT or Royal Mail and receive invoice for payment in 30-days
Step 4 Make payment via BACS to our factoring partner,
Item | Concrete Come Along Rake |
Blade Length | 20" |
Blade Width | 20" |
Handle Length | 54" |
Handle Material | Vinyl Coated Fiberglass |
Handle Type | Straight |
Head Material | Steel |
Ship weight (kg) | 2.34 |
Ship height (cm) | 19.05 |
Ship length (cm) | 138.43 |
Ship width (cm) | 53.34 |
HS code | 8201300080 |
Country of Origin | US |
A. No, this rake has a vinyl coating to resist chemical attacks and corrosion.
A. The head is made of steel to resist abrasion during concrete casting.
A. Pour the concrete mix into evenly sized batches. Before levelling, the top of the concrete mounds should be 2 to 3 inches above the forms. Use Nupla 79-314 concrete come-along rake to distribute and consolidate the concrete. The concrete's surface should be flat and slightly elevated above the form.
Contact your account manager right away to get personal advice.
We're available Monday through Friday, from 07:30 until 17:00.